{"data":{"currency":"usd","unit":"Metered by billable call once you send a live key on a paid plan. Anonymous and test-key calls never bill; they are rate-limited instead.","determinism":"Every response is a projection of a cited OMB or agency BABA dataset plus deterministic arithmetic. There is no model in the request path, so the same query always returns the same answer. Every threshold and waiver carries a `confidence` of \"verified\" or \"verify\" (render \"verify\" as Unverified, never as fact) and the source URL behind it. Where the loaded ruleset holds no agency or standard for an input, the response says insufficient_data rather than reporting a pass: absence of guidance is never treated as compliance.","anonymous":{"price_usd":0,"rate_limit_per_minute":4,"rate_limit_per_day":20,"api_access":false,"record_export":false,"note":"No key needed. Every endpoint (determine, thresholds, waivers) works at this throttled rate. The paid features (saved history, cross-agency compare, record export) live in the web app."},"test_key":{"rate_limit_per_minute":10,"rate_limit_per_day":200,"bills":false,"note":"A src_test_ key (see /api/v1 auth) never bills; it only raises the anonymous throttle."},"plans":[{"id":"free","name":"Free","price_usd_per_month":0,"cadence":"free forever","tagline":"Run a bill of materials, look up any agency threshold. No card, no signup.","included_api_calls_per_month":0,"rate_limit_per_minute":0,"bom_lines_per_run":25,"saved_determinations":0,"seats":1,"api_access":false,"determination_history":false,"batch_bom":false,"record_export":false,"compliance_analytics":false,"cross_agency_compare":false,"mcp_production":false,"priority_support":false,"features":["Line-by-line BABA calculator, runs in your browser so BOM data is never transmitted","Every agency and waiver reference page, with cited thresholds","COMPLIANT / NON-COMPLIANT / WAIVER-ELIGIBLE verdicts with the OMB or agency citation","Test API key for developers (throttled, never bills)","Public API and MCP at the anonymous rate"]},{"id":"pro","name":"Pro","price_usd_per_month":49,"cadence":"per month","tagline":"For the estimator or contractor bidding federally-funded work every month.","included_api_calls_per_month":1000,"rate_limit_per_minute":60,"bom_lines_per_run":500,"saved_determinations":"unlimited","seats":1,"api_access":true,"determination_history":true,"batch_bom":true,"record_export":true,"compliance_analytics":true,"cross_agency_compare":true,"mcp_production":true,"priority_support":false,"features":["Saved determination history with the verdict and the agency standard it was checked against","Audit-ready determination record export for your bid file, with the citations behind it","Cross-agency compare: run one BOM against several funding agencies at once","Compliance-gap analytics across your saved determinations","Determination API and MCP server (1,000 calls/mo), up to 500 BOM lines per run","Inspectable request log"]},{"id":"scale","name":"Scale","price_usd_per_month":149,"cadence":"per month","tagline":"For manufacturers and products built on the determination API.","included_api_calls_per_month":10000,"rate_limit_per_minute":300,"bom_lines_per_run":5000,"saved_determinations":"unlimited","seats":1,"api_access":true,"determination_history":true,"batch_bom":true,"record_export":true,"compliance_analytics":true,"cross_agency_compare":true,"mcp_production":true,"priority_support":true,"features":["Everything in Pro","10,000 API calls/mo","300 requests/minute burst","Bills of materials up to 5,000 lines per run","Priority support"]}],"checkout":{"note":"There is no machine-callable checkout API: a signed-in human starts Stripe Checkout from the billing page. An agent choosing a plan on a user's behalf should direct them to upgrade_url.","upgrade_url":"https://sourceory.com/pricing"}},"disclaimer":"Sourceory provides Build America, Buy America compliance guidance based on published OMB and agency sources. It is not legal advice and not an official agency determination or waiver. BABA guidance and waivers are updated over time and are fact-specific. Always confirm against the funding agency's current guidance and your grant terms before certifying compliance or applying for a waiver.","attribution":"Determination from Sourceory (https://sourceory.com): Build America, Buy America domestic-content standards and waiver categories, cited by OMB or agency source and confidence. Free responses require this attribution."}